Still not shipped.. Back order time has increased to 25 days per Provantage. I ordered on Aug 2, but they "verified" the order on Aug 5. This is about 3 weeks ago, so hopefully it will ship someday soon! My case should arrive on Monday, and all other parts of my new build have arrived.I special ordered a Xeon E-2288g for about $530 plus shipping and tax. They indicated 18 days back order on August 2. Currently showing 21 days back ordered.. Still waiting on my Cerberus X case to ship, so not an emergency yet. Aug 2 + 18 days plus 3-4 days shipping means I may see it this week.
I will post any new info.
I faced the same issue with Provantage and ordering a E-2176G CPU when it first released. I filled the delivery gap with a I3-8350K CPU that saw a month of usage and has been sitting in the desk drawer ever since. Also have a E-2174G that was utilized for the same purpose. They are available if you're interested...Still not shipped.. Back order time has increased to 25 days per Provantage...
I am considering canceling the CPU and buying a cheap I3-9xxx chip .
I faced the same issue with Provantage and ordering a E-2176G CPU when it first released. I filled the delivery gap with a I3-8350K CPU that saw a month of usage and has been sitting in the desk drawer ever since. Also have a E-2174G that was utilized for the same purpose. They are available if you're interested...
Have you received the CPU?My Xeon E-2288g allegedly shipped today! Provantage had listed them as IN STOCK, qty 4. I called them, they said they would check with the supplier about my order. No answer after 2.5 hours, so I called back. They said it had shipped, and they would send me the tracking number.
One hour later, yet no tracking number.. I need the tracking number so that I can divert the package to a new address.
It looks like the long wait is over.
I have some Dell Precision* 3630's with E-2286G CPUs allegedly arriving on October 1st. The 2200-series CPUs are what pushed the delivery date back. I would think that Dell would be getting some of the first CPUs available. I wonder if the whole "soft launch" (or "failure to launch" ) of these parts is due to the Intel server CPU shortages - the 2200's are apparently launched for workstations but not for servers, despite being the same part.It's pretty ridiculous what's going on with Intel honestly.
Mine arrived today. Unfortunately not everything else for it has arrived... parts are hard to come by. The RAM (16GB VLP sticks) is delayed by a week or two.Have you received the CPU?
No.. I did receive a shipping number, it is moving towards my old address. Provantage is unable to change the delivery address 3 weeks prior. So an ex-coworker will reship it to me. I hope to get it this Friday.Have you received the CPU?
Can't comment on the desktop Precisions, but the Mobile Workstations are awesome.I have some Dell Precision* 3630's with E-2286G CPUs allegedly arriving on October 1st. The 2200-series CPUs are what pushed the delivery date back. I would think that Dell would be getting some of the first CPUs available. I wonder if the whole "soft launch" (or "failure to launch" ) of these parts is due to the Intel server CPU shortages - the 2200's are apparently launched for workstations but not for servers, despite being the same part.
I finally got my CPU. I installed it and it boots with the stock bios, on a MB shipped 2 months ago.No.. I did receive a shipping number, it is moving towards my old address. Provantage is unable to change the delivery address 3 weeks prior. So an ex-coworker will reship it to me. I hope to get it this Friday.