For 2023 x-mas I decited to renew my aging home IT equiment and besides adding some performance my main goals are reducing power consumption and go a more software defined way. In detail that means:
So the new server will be server, switch, router and firewall all in one. I'm going to get a 25Gbit FTTH soon and with this setup I want to make sure that I can make use of it well
All the hardware is ordered already and will arrive within the next 10 days.
Hardware
Considerations:
Software
Considerations:
Please share your thoughts and any experiences.
- Discard Mikrotik CCR
- Discard Mikrotik CRS
- Replace Xeon D-1541/8HDD server
So the new server will be server, switch, router and firewall all in one. I'm going to get a 25Gbit FTTH soon and with this setup I want to make sure that I can make use of it well
All the hardware is ordered already and will arrive within the next 10 days.
Hardware
Supermicro X13SEM-TF board- AsRock SPC741D8-2L2T/BCM board
- Intel Xeon Silver 4410Y CPU
- 256GB DDR5-4800 Reg. ECC
- 8x Intel DC P4510 8TB U.2
- Intel E810-XXVDA2 Dual Port SFP28
- Intel XL710-BM Quad Port SFP+
- Fractal Design Meshify 2 Black case
4 MCIO 74p to dual U.2 cables- 2 PCIe x16 to dual SlimSAS 8X riser cards
- 4 SlimSAS 8X to dual U.2 cables
- FSP 850W PSU
Considerations:
- U.2 Hot-Swap backplanes look really fancy. However, in my professional life I never got VMD hot-swapping reliable. Also, each NVMe draws up to 22W of heat so I decided to install them fixed behind two quiet 140mm Noctua fans. This saves 700 bucks I might need elsewhere*.
- The CPU architecure was choosen mainly because of QAT v2 support for Wireguard
and the stunning mainboard that has the NVMe options built-in
Software
- Proxmox PVE 8.1
- KVM:
- VyOS 1.5 with 25GBe NIC and QAT pass-trough
- Container: Technitium DNS
- VyOS 1.5 with 25GBe NIC and QAT pass-trough
- LXC:
- Samba AD DC
- Samba FS
- OCIS 4
- Gitlab
- Vaultwarden
- Zabbix
- Grocy
- KVM:
Considerations:
- VyOS does not yet fully support VPP/DPMK so it might not work to get full 25Gbit. In this case I'd need to spend the saved money for TSNR.
- I need to benchmark the storage options. Currently focussing on MDRAID-5/6 with XFS and ZFS RAIDz1/2.
Please share your thoughts and any experiences.
Last edited: