Question:
A person is planning for an upcoming transition to vrealize automation and wants to know if the existing vsphere5.5 infrastructure can be leveraged for the implementation. Which one is correct:
a>the vsphere 5.5 infrastructure can't be used , as vrealize automation can only utilize vCloud Director based resources
b>The vsphere5.5 infrastructure can be used , but a minimum of two vrealize automation endpoints must be deployed
c>The vsphere5.5 infrastructure can be used, but the vCentre server must reinstalled
d>The vsphere5.5 infrastructure can be used to deploy vrealize automation aith no major changes
A person is planning for an upcoming transition to vrealize automation and wants to know if the existing vsphere5.5 infrastructure can be leveraged for the implementation. Which one is correct:
a>the vsphere 5.5 infrastructure can't be used , as vrealize automation can only utilize vCloud Director based resources
b>The vsphere5.5 infrastructure can be used , but a minimum of two vrealize automation endpoints must be deployed
c>The vsphere5.5 infrastructure can be used, but the vCentre server must reinstalled
d>The vsphere5.5 infrastructure can be used to deploy vrealize automation aith no major changes