Question:
A person is planning for an upcoming transition to vrealize automation and wants to know if the existing vsphere5.5 infrastructure can be leveraged for the implementation. Which one is correct:
a>the vsphere 5.5 infrastructure can't be used , as vrealize automation can only utilize vCloud Director based resources
b>The vsphere5.5 infrastructure can be used , but a minimum of two vrealize automation endpoints must be deployed
c>The vsphere5.5 infrastructure can be used, but the vCentre server must reinstalled
d>The vsphere5.5 infrastructure can be used to deploy vrealize automation aith no major changes
 

tjk

Active Member
Mar 3, 2013
482
200
43
I'll bite.

(a) doesn't make sense, since VCD requires vSphere to operate.
(b) you can do a simple install of only one vcac appliance, it doesn't require 2 unless you do distributed or large scale deploys.
(c) vCenter 5.x is supported, so not sure why you would need to re-deploy it to use vCAC/vRA.
(d) My answer!?
 

indiannnalco

New Member
Jun 5, 2015
5
0
1
31
The physical datacenter on which a company's private cloud runs is nearing capacity. Which option would allow the company to temporarily move some of it's workloads to a leased public cloud?
a>site recovery manager
b>fabric suite
c>Vrealize operations
d>vCloud connector