Hello everyone, I'm getting ready to build my first server (with actual server parts) and want to make sure I'm not overlooking anything. This will replace my existing i7-3770 server and will use as a NAS and running data automation tasks.
OS: Proxmox (w/ TrueNas Core VM)
CPU: Epyc 7313P
MoBo: Supermicro H12SSL-CT
Case: Rosewill RSV-l4412U
HDD: 48TB (8x6TB Seagate IronWolf ST6000VN0016)
SSD: 4TB (2x2TB Samsung 870)
M.2: 250-500GB m.2
RAM: 256GB (8x32SB DDR4-3200 ECC)
Add-in: 3ware 9500S-12
Power: EVGA SuperNOVA 1600
The server will host:
- TrueNAS Core VM (pass through 3ware controller with the HD and 2 SSDs)
- Windows VMs (1 for automation on apps, and the rest for work/testing)
- Apache Airflow VM
- Docker (e.g., databases, Portainer, etc.)
I'm planning on using this for the next 5+ years and want to make sure the parts work well together.
OS: Proxmox (w/ TrueNas Core VM)
CPU: Epyc 7313P
MoBo: Supermicro H12SSL-CT
Case: Rosewill RSV-l4412U
HDD: 48TB (8x6TB Seagate IronWolf ST6000VN0016)
SSD: 4TB (2x2TB Samsung 870)
M.2: 250-500GB m.2
RAM: 256GB (8x32SB DDR4-3200 ECC)
Add-in: 3ware 9500S-12
Power: EVGA SuperNOVA 1600
The server will host:
- TrueNAS Core VM (pass through 3ware controller with the HD and 2 SSDs)
- Windows VMs (1 for automation on apps, and the rest for work/testing)
- Apache Airflow VM
- Docker (e.g., databases, Portainer, etc.)
I'm planning on using this for the next 5+ years and want to make sure the parts work well together.