I'm likely going to colo the cluster in Las Vegas, NV. 1/4 locking Cab + 50mbps. Would only cost me ~$200 more/ month to move to a 1/2 cab with 100mbps, and would have 3x the power (15A) than the 1/4 cab.
Just thinking that if anyone had a machine or two that they wanted to colo, might be able to share a bit of the infrastructure. Would also allow me to add a larger backup/ storage server.
This really started life as a nitrobass24 idea.
Just thinking that if anyone had a machine or two that they wanted to colo, might be able to share a bit of the infrastructure. Would also allow me to add a larger backup/ storage server.
This really started life as a nitrobass24 idea.