i think he is working on his 1 million air miles for 2019.
Yea the 215K mile/ year pace and one flight every three days was getting rough.
Actually, I just looked at our pipeline for the next month. If we get everything finished, we have enough in-progress to do 4 reviews per week for the next month.
When we had shorter reviews, this was doable. With the longer reviews, we have had 1-2 week bursts like that. But the scale, scope, and diversity of what is coming starting this week are beyond what I think we have the capacity for. I am fairly sure that is simply called "growth mode."
So this is hunker down between flights and get this done. Realistically we need to cover a lot this quarter. I was hoping our budget would be a bit less stressed at this point, but it is not so we are in do more with less mode which is OK.
I am still checking the forums, but I have to meter how much I can reply versus spend my time writing and editing for the main site.