Quanta QSSC-2ML Server Cluster – 37 Servers total - $7,000 or OBO
Will to sell each server Individually for $300 or OBO

Each server specs
Dual Intel Xeon E5-2670 SR0KX 2.60 GHz
64GB DDR3 ECC Memory
Each server has a 3.5 inch sata hard disk varies in size from 160gb to 500gb.
1x Quanta LB8 10G gigabit 48 port SFP+ switch
40x SFP+ DAC Cables
2x APC AP7541200-240 VAC 30A PDU
Fully Functional server cluster for Rendering or any other compute purpose.
Server Rack Included
Local Pickup in NJ/NY Area



Asking $7,000 or OBO
 
Last edited:

gigatexal

I'm here to learn
Nov 25, 2012
2,733
524
113
Portland, Oregon
alexandarnarayan.com
drool!!!! comes to 385USD per server that's insane

if you don't find a buyer here perhaps there's a server hardware reseller that will buy the bulk, albeit I am sure they will lowball this already incredible price
 

Serverking

Active Member
Jan 6, 2019
243
81
28
Are you running this at your house? Can you sell the "1x Quanta LB8 10G gigabit 48 port SFP+ switch" alone?
 

ycp

Member
Jun 22, 2014
175
8
18
@Serverking - Sorry don't want to part out the system.

@LukeP - Did not mine with these it was for a 3d render project i was working on. Not needed now.
Actually I don't know for sure if these Mobo's support v2.
 

wildpig1234

Well-Known Member
Aug 22, 2016
1,775
264
83
45
@Serverking - Sorry don't want to part out the system.

@LukeP - Did not mine with these it was for a 3d render project i was working on. Not needed now.
Actually I don't know for sure if these Mobo's support v2.
By this page it seems like it does support v2:

Cheap Sixteen Core Quanta 1U Cloud Server 4x 3.5\

then again i couldn't find any bios info so i wouldn't bet much

very impressive looking though. but i can't imagine how much power and heat from this thing.....
 
Last edited:

Evan

Well-Known Member
Jan 6, 2016
3,037
501
113
Assuming all nodes doing hard work or could be 20kw or so. On the slight conservative side say 14kw or about 350w per node.
I don’t know the specific servers. But a dual e5 can when worked harder use 500w, certainly not less than 350w anyway.
 

wildpig1234

Well-Known Member
Aug 22, 2016
1,775
264
83
45
Assuming all nodes doing hard work or could be 20kw or so. On the slight conservative side say 14kw or about 350w per node.
I don’t know the specific servers. But a dual e5 can when worked harder use 500w, certainly not less than 350w anyway.
so would need like at least 10 wall outlets?