Sick!!!Alright, build id 99% done. Spent the past week flushing my system with Mayhems Blitz to clean out any gunk from rads/blocks and then 4-5 times with distilled water. Followed that up with some short benchmark tests to ensure temps weren't poor due to any poor installation of blocks. I'm still waiting on my custom sleeved cables and as you can see I ran out of coolant to top off my reservoirs. I'll have final build pics by the end of the week. Here's a quick sneak peak for now.
Disclaimer, I've done no cable management as there's no point until my custom PSU cables are in.
Sent from my ONEPLUS A5000 using Tapatalk